You are here

Shell awards trenching contract to Canyon Offshore

Helix Energy subsidiary, Canyon Offshore, has been awarded a contract by Shell to trench and bury over 40km of pipe in the BC-10 field in the Campos basin offshore Brazil
Shell awards trenching contract to Canyon Offshore

Helix Energy Solutions Group has announced that Shell has awarded a contract to Helix’s robotics subsidiary, Canyon Offshore, to trench and bury over 40km of pipe in 1675m of water in the Campos basin offshore Brazil. The work will be performed at the Shell operated BC-10 field in the 4Q 2015 from the DP III M/V Grand Canyon I utilizing the T-1200 deepwater trenching system.

“Shell and Canyon have a long history of developing and utilizing pipeline burial trenching as a flow assurance enhancement tool, and we have performed numerous projects together in the past using this successful technology,” said Ian Edmondstone, president of Canyon. “This will be the deepest pipeline trenching project ever performed offshore Brazil and the vessel Grand Canyon I deploying T-1200 is the perfect set of tools for the job.”

Image:T-1200/ Helix Energy

Latest profiles